Site Preparation & Civil Work

Land leveling

We prepare the site through precise land leveling to ensure a stable, uniform surface that supports accurate module installation and efficient drainage.

Boundary fencing

We install secure boundary fencing around the project area to safeguard equipment, prevent unauthorized access, and ensure site safety throughout the plant’s lifespan.

Control room construction

We construct a fully equipped control room to house inverters, monitoring systems, switchgear, and other essential electrical components in a safe, controlled environment.

Foundation pile driving / RCC pedestals

We build strong foundations using pile driving or RCC pedestals based on site geology, ensuring mounting structures remain firm and stable under all weather conditions.

Cable trenches

We develop well-planned cable trenches to protect underground electrical cables, ensuring safe routing, reduced transmission losses, and long-term system reliability.